реферат
реферат

Меню

реферат
реферат реферат реферат
реферат

Quality of life and management of living resources

реферат

|(CRAFT) |3 | | |FF | | | | | | | | | | | | |rate)x(personn|

| |SME | | | | | | | | | | | | | | | |el) |

|Exploratory |min | | |Fixed|75%2 | | | | | | | | | | | | |

|awards |2 | | |amoun| | | | | | | | | | | | | |

| |SME | | |t | | | | | | | | | | | | | |

|TRAINING | | | | | | | | | | | | | | | | | |

|FELLOWSHIPS | | | | | | | | | | | | | | | | | |

|Marie Curie Host |inst| |min |Fixed| | | | | | | | | | | | | |

|Fellowships |itut| |1 |amoun| | | | | | | | | | | | | |

| |ion | |fell|t | | | | | | | | | | | | | |

| | | |ow | | | | | | | | | | | | | | |

|Marie Curie | | |1 | | | | | | | | | | | | | | |

|Individual | | |fell| | | | | | | | | | | | | | |

|Fellowships | | |ow | | | | | | | | | | | | | | |

|Developing | | |1 | | | | | | | | | | | | | | |

|countries | | |fell| | | | | | | | | | | | | | |

|Fellowships | | |ow | | | | | | | | | | | | | | |

|Fellowships for |fell| | | | | | | | | | | | | | | | |

|Community |ow | | | | | | | | | | | | | | | | |

|Researchers | | | | | | | | | | | | | | | | | |

|SUPPORT TO | | | | | | | | | | | | | | | | | |

|NETWORK | | | | | | | | | | | | | | | | | |

|Thematic network|min | |yes |AC |Up to |yes| |yes |yes | |yes | |Yes | | | |20%1 |

| |1 | | | |100% | | | | | | | | | | | | |

|Training network |1 | |min.|AC |Up to | | | | | | |Yes | | | | |20%1 |

| | | |4 | |100% | | | | | | | | | | | | |

|CONCERTED ACTIONS|min | |yes |AC |Up to |yes| |yes |yes | |yes | |yes | | | |20%1 |

| |1 | | | |100% | | | | | | | | | | | | |

|ACCOMPANYING | | | | | | | | | | | | | | | | | |

|MEASURES | | | | | | | | | | | | | | | | | |

|Accompanying |min | | | |Up to |yes|yes |yes |yes |yes |yes |Yes |yes |yes | | |yes5 |

|measures 3 |1 | | | |100% | | | | | | | | | | | | |

|Euro conference |1 | | | |Up to |yes| |yes |yes |yes | | |yes4|yes | | |None |

| | | | | |100% | | | | | | | | | | | | |

|Technology |min | |yes | |Up to |yes|yes |yes |yes |yes |yes |yes |yes |yes | | |yes6 |

|Take-up |1 | | | |100% | | | | | | | | | | | | |

* FC = Full Costs/ FF= Full costs Fixed rate/AC= Additional Costs/ UF =

User Fee. For more information, see Box 7.

1 Direct costs, excluding subcontracting costs

2 Up to maximum of €22,500

3 For subsidies, see the Vademecum on grant management and com pv(98) 1395

4 Organisation costs (see specific Guide for Proposers Part 2)

5 Overhead is calculated as a lump sum of the personnel costs (not

exceeding 80%).

6 The eligible cost categories for each of the types of technology take-up

measures are referred to in the relevant Guide for Proposers, Part 2

7 Two alternative contracts are available respectively to the R&D and the

Demonstration. One is the “Deliverables”, by which the contribution is paid

in pre-set amounts and adjusted with the final payment on the basis of

actual costs for the whole contract. The other is the “flat rate” (for

projects estimated less than 100 000 euro) by which the contribution

consists of a fixed amount based on the estimated costs for the work.

Box 7 - Methods for the calculation of EC funding

Full cost (FC)

The participant can identify all the direct and indirect costs related to

the project. He should be able to demonstrate that his accounting system

enables the identification of those costs with sufficient precision. FC =

total direct costs + actual overhead rate.

Full costs Flat rate (FF)

The participant who may participate on a full costs basis or who can

identify his direct costs related to the project (temporary and permanent

staff) but not the indirect costs linked to the project may elect the

overhead to be charged on a flat rate basis, 80 % of the direct personnel

cost.

Additional cost (AC) - in R&D projects

Subject to the specific contract terms, the Commission shall only take into

account the project’s additional (non recurrent) costs. AC = total direct

additional costs + x% overhead on direct costs (excluding subcontracting)

(for x% see Box 6).

Additional cost (AC) - in Concerted Actions/Thematic networks and

Euroconferences

The Community funding shall only cover the direct costs necessary for the

action, however, costs for permanent staff are eligible if time records are

kept. AC = total direct additional costs + x% overhead on direct costs

(excluding subcontracting) (for x% see Box 6).

User Fee (UF)

This system is only used in the context of projects providing access to

research infrastructure. It is based on a "unit cost", which is a fixed

composite rate, for each access. Travel and subsistence costs and a flat

rate contribution for general expenses are added. The participant should be

able to demonstrate that his accounting system enables him to calculate

with sufficient precision the "unit cost". UF = ((unit cost x quantity of

access) + travel and subsistence costs) + 20% overhead.

Costs categories

A cost shall be considered as eligible only where it is necessary for and

during the project and is provided for in the contract. It shall be

reimbursed if the amount has actually been spent and recorded in the

accounts. No profit may be included.

Personnel costs: subject to the contract terms, scientific and

technical personnel; time devoted to the project shall be

recorded.

Durable equipment: subject to the contract terms, equipment shall be

reimbursed according to a depreciation period (for

computer equipment that cost less than 25.000 Euro the

depreciation period is 36 months, for all other equipment

the depreciation period is 60 months) and its use on the

project; equipment leased shall be reimbursed without

exceeding the eligible cost if it were to be purchased.

Subcontracting: external services.

Travel and subsistence: travel outside the European Union or an

Associated State needs the prior approval of the

Commission, except for visiting a participant.

Consumables: only project specific items.

Computing: only project specific items.

Protection of knowledge: subject to contract terms, only with prior

approval of the Commission

Other specific costs any cost necessary for the project, not falling

within a defined category and having received the prior

approval of the Commission

Co-ordination costs: costs for the financial/administrative

administration (personnel, travel and all other cost

categories apart from subcontracting) incurred only by the

co-ordinator - the financial/administrative co-ordinator

in case of split between scientific and administrative co-

ordinator - in order to fulfil his tasks.

Access: only for Support for access to research infrastructure; user

fee related to visiting scientist.

RTD performer only for SME co-operative research project; cost of

research performed by a non-participant.

Overheads: subject to the contract terms, either an actual rate (FC), or a

flat rate (FF) calculated on personnel costs or on the

direct additional costs (AC) excluding subcontracting, or

as a lump sum of personnel costs (Accompanying Measures).

BOX 8 - Intellectual Property Rights

The following table lists the access rights (license on a patent, other

users rights) to knowledge (intellectual property created during the

project) and know-how (pre-existing intellectual property) as a function of

the different types of actions and participants.

| |Knowledge |Pre-existing know-how |

| | |necessary for the |

| | |execution of the project|

| | |or to use its Knowledge |

| |Access |Use* |Access |Use |

| |rights for | |rights for | |

| |the | |the | |

| |execution of| |execution | |

| |the project | |of project | |

|Research |Principal |Royalty-free|Royalty-free |Favourable |Favourable |

|and |Contractor| |(1) to all |conditions |conditions |

|technologi| | |knowledge | | |

|cal | | | | | |

|developmen| | | | | |

|t Project | | | | | |

| |Assistant |Royalty-free|Favourable |Favourable |/ |

| |Contractor|/ Favourable|Conditions/ |Conditions/| |

| |(2) |Conditions |Market |Market | |

| | | |conditions |conditions | |

| | | |(1) | | |

| |Principal |Favourable |Market | | |

| |Contractor|Conditions |conditions | | |

| |of the | | | | |

| |same | | | | |

| |specific | | | | |

| |programme | | | | |

|Demonstrat|Principal |Royalty-free|Favourable |Favourable |Favourable |

|ion |Contractor| |Conditions |conditions |conditions |

|Project | | |for | |for |

| | | |Exploitation | |Exploitation|

| | | |only, to all | |only |

| | | |knowledge | | |

| |Assistant |Royalty-free|Favourable |Favourable |/ |

| |Contractor|/ Favourable|Conditions/ |Conditions/| |

| |(2) |Conditions |Market |Market | |

Страницы: 1, 2, 3, 4, 5, 6, 7, 8


реферат реферат реферат
реферат

НОВОСТИ

реферат
реферат реферат реферат
реферат
Вход
реферат
реферат
© 2000-2013
Рефераты, доклады, курсовые работы, рефераты релиния, рефераты анатомия, рефераты маркетинг, рефераты бесплатно, реферат, рефераты скачать, научные работы, рефераты литература, рефераты кулинария, рефераты медицина, рефераты биология, рефераты социология, большая бибилиотека рефератов, реферат бесплатно, рефераты право, рефераты авиация, рефераты психология, рефераты математика, курсовые работы, реферат, доклады, рефераты, рефераты скачать, рефераты на тему, сочинения, курсовые, рефераты логистика, дипломы, рефераты менеджемент и многое другое.
Все права защищены.